There are so many benefits to procuring a ground investigation of your site. Our team of experts can discuss your project to ensure we understand the purpose and the specific details which are important to report on.
If you need a quotation, pricing, or full geotechnical survey, visit our Geotechnical and Ground Investigations Services page to get started.
In this guide, we provide all the information you need to know about the processes of ground investigations, and answer some of the frequently asked questions we receive from our clients regarding ground investigation works.
Ground investigations are no longer just a planning formality. With tighter regulatory scrutiny, increasing foundation failures linked to historic land use, and greater emphasis on sustainability and risk allocation, site investigation now sits at the centre of project viability. Misinterpreting soil conditions, groundwater regimes, or contamination risk can result in any of the following:
A properly scoped ground investigation does not just gather data, it defines commercial risk boundaries before construction begins
A ground investigation is used to assess the ground conditions and sub surface structure of a site. Ideally, this should be deployed before the construction on the site starts. They are a vitally important aspect of any development project, as having a detailed understanding of what you are building on is vital to the success of the construction process.
It is imperative to gain an accurate understanding of ground conditions when undertaking a development project. This will determine whether a proposed building design is feasible and safe from a geotechnical perspective.
A ground investigation is essential for gathering factual data for the underlying geology and groundwater levels, that can be interpreted for geotechnical and geo-environmental purposes across a wide range of projects, including residential and commercial developments, as well as infrastructure like highways and bridges.
Ground Investigation is required by but not limited to:
To ensure that the outcome of a ground investigation fulfils the objectives of your project, we will follow the steps below and keep you informed throughout the project:
Most ground investigations begin with a Phase 1 Desk Study, followed by a Phase 2 Intrusive Site Investigation (SI). Understanding the distinction is critical for cost control, planning compliance and risk mitigation.
This includes:
This stage identifies any potential contamination, instability, groundwater risk, or made ground before intrusive works are commissioned.
If risks are identified, intrusive works follow, and this can include:
Laboratory testing is then undertaken to determine engineering parameters or contamination levels. This staggered approach ensures that intrusive works are proportionate, risk-led, and commercially justified.
Find out more about our Phase 1 Desk Study services and reports solutions.
Both surveys use similar site techniques, but the data obtained and how we manage the data make the difference. The difference comes in the type of samples obtained, the scheduled laboratory tests and data interpretation.
More specifically:
Depending on the site, a range of risks can be recognised, including the potential for unsuitable ground conditions for the intended use of land. Our goal at Technics is to determine the most appropriate ground investigation techniques that align with the site’s characteristics and its current or future land use, and deliver results that fit the purpose of the project.
All results from the report is then provided to our clients as a Factual or Interpretative Report according to the project requirements.
Here are a few examples.
Ground investigation doesn’t directly mitigate risks, but it does aims to identify the underlying hazards responsible for those risks. This investigation process helps identify these potential hazards, allowing for the further solutions or actions needed to reduce these hazards occurring. These hazards can be either poor ground conditions for future site development or ground and groundwater contamination.
Like any survey, ground investigation has its limitations. When we investigate the ground we can never achieve complete certainty about the challenges we may encounter on a site, even in simple projects, and that’s why we need to treat each project uniquely.
Limiting factors can be irrelevant to the ground conditions, such as limited access, safety hazards, buried services, overhead cables, working on highways or near rails, or in some cases there is the need for temporary works design to be undertaken to enable ground investigation works such as the building of a platform to allow access to the drilling locations.
Our work is to identify these limiting factors, evaluate them, and devise a detailed plan to overcome them.
Depending on site requirements we can use a variety of ground investigation techniques, which are explained below.
This method involves the use of a rotating drilling which is capable of core through and sampling various types of rock and soil and giving us Class A samples. We can get disturbed, bulk, SPT’s samples and core samples.
This is a dynamic sampling technique where a drill bit is repeatedly lifted and dropped to sample any type of soil. This technique is relatively cheap and gives us samples to great depths. We can get disturbed, bulk, SPT’s and undisturbed samples.
[spacer height=”-10px” id=”5″]
Small flexible dynamic sampling technique. The principle is the same as cable percussion but on a smaller scale. It reaches shallower depths and is cheap and ideal for areas with limited access. We can get disturbed, bulk, SPT samples.
[spacer height=”-10px” id=”5″]
For shallow investigations, excavations or hand-dug trial pits are employed to visually inspect and sample soil up to a maximum depth of 1.20 meters below ground level. In cases requiring deeper investigations, machine-excavated trial pits are the preferred choice. We can get disturbed and bulk samples.
Hand Shear Vane – measures the shear strength in cohesive soils and informs us on Cu value.
[spacer height=”-10px” id=”5″]
TRL-DCP – a good way to get the bearing capacity of the soil and CBR% for shallow depths. This technique gives us essential information on flexible pavement and roadwork design.
[spacer height=”-10px” id=”5″]
Groundwater Monitoring – falling head test, rising head test: helps to measure the groundwater levels and calculate the permeability of the ground.
[spacer height=”-10px” id=”5″]
Soakaway Test – an infiltration test is a method used to determine the rate at which water can infiltrate through the ground. This information is crucial when designing drainage systems, particularly for soakaways.
Technics are always keeping the highest standards in both on-site work and reporting. We work under the requirements of the CDM Regulations 2015. All our works are according to the standards below: