Client: Crossrail
Site: Various across London
Type:Utility, Topographic, 3D modelling, GIS.
Technics Group have been involved with the project for many years now and are the longest standing term contractor for utility surveys. Initially playing a pivotal role in undertaking a number of “Preliminary” surveys which proved the effectiveness of using our ground probing radar based utility mapping services. Since these initial surveys The Technics Group have undertaken some of the biggest utility mapping surveys ever awarded on behalf of the Crossrail Enabling Works Team.
"The Utility Survey Works undertaken by Technics Group as part of the enabling works on the Crossrail Project, have allowed careful planning of Utility Diversions and have been extensively used for key design works. With accurate timetabling and an upfront approach to Health & Safety, Technics Group have performed well throughout their term contract period"
Darren Over
Crossrail Section Manager - Enabling Works (North Kent Line)